Power outage: the EDF Luminus exchange is switched off!



After the fire that took place on Monday and hit Resa's medium-voltage cabin in Flémalle, EDF Luminus can not use its hydro turbines for electricity production.

As a reminder, the medium voltage cab Flémalle exploded on Monday afternoon. It is the cause of the power outage that took place in the Liège region. The incident caused operational problems at EDF Luminus. As a result, the hydro power plant has been shut down.


Source link

Leave a Reply