Drivers want more money to maintain and repair bridges, the problem is the excessive increase in traffic



BRATISLAVA, August 19 (WebNoviny.sk) – National Motor Company, a. S. (NDS) plans to spend 6.5 million euros this year on maintenance and repair of bridges. euro. In the past year she used $ 4.5 million

"Since the repair process of the bridge is demanding and takes more than a year, it is not possible to clearly identify the need for financing for the coming years," Nita spokeswoman Michaela Michalová informed the SITA

] This year, drivers repair the Podbanská, Korytna and Skala bridges on the D1 motorway, Kováčová on the R1 and Košice motorways on the 1st roadway Nr.

Excessive traffic growth

The NDS reports 759 bridges totaling 89.407 meters, according to the status at the end of last year. "Of all bridges in the NDS report, there are 29 bridges on the scale from I to VII in the structural engineering V, that is to say bad, especially on older parts of motorways and motorways that we are constantly repairing. bad or emergency state (state VI, VII) are not found in the NDS report ", said Michalová.

An excessive increase in freight and freight traffic over the past decade means an increased load on bridge constructions.

Cestovny ” am-card-image=”top” srcset=”https://cdn.webnoviny.sk/sites/32/2017/07/cestari-81×54.jpg 81w, https://cdn.webnoviny.sk/sites/32/2017/07/cestari-676×451.jpg 676w, https://cdn.webnoviny.sk/sites/32/2017/07/cestari-768×512.jpg 768w, https://cdn.webnoviny.sk/sites/32/2017/07/cestari-992×661.jpg 992w, https://cdn.webnoviny.sk/sites/32/2017/07/cestari-160×107.jpg 160w, https://cdn.webnoviny.sk/sites/32/2017/07/cestari-312×208.jpg 312w, https://cdn.webnoviny.sk/sites/32/2017/07/cestari-672×448.jpg 672w, https://cdn.webnoviny.sk/sites/32/2017/07/cestari-120×80.jpg 120w” sizes=”(max-width: 81px) 100vw, 81px” data-dominant-color=”#a75432″/>

Cestovny ” am-card-image=”top” srcset=”https://cdn.webnoviny.sk/sites/32/2017/07/cestari-81×54.jpg 81w, https://cdn.webnoviny.sk/sites/32/2017/07/cestari-676×451.jpg 676w, https://cdn.webnoviny.sk/sites/32/2017/07/cestari-768×512.jpg 768w, https://cdn.webnoviny.sk/sites/32/2017/07/cestari-992×661.jpg 992w, https://cdn.webnoviny.sk/sites/32/2017/07/cestari-160×107.jpg 160w, https://cdn.webnoviny.sk/sites/32/2017/07/cestari-312×208.jpg 312w, https://cdn.webnoviny.sk/sites/32/2017/07/cestari-672×448.jpg 672w, https://cdn.webnoviny.sk/sites/32/2017/07/cestari-120×80.jpg 120w” sizes=”(max-width: 81px) 100vw, 81px” data-dominant-color=”#a75432″/>

Prístavný most v Bratislave cez Dunaj na D1 (hlavný mostný objekt) má stav III, teda dobrý a ďalší dunajský most v hlavnom meste Lafranconi na D2 IV, so satisfying.

"On both bridges, construction work has been carried out in recent years in the field of maintenance and repairs (replacement and repair of bridge finishing, (19459006) are appointed by Michalová

Road safety and speaking skills

The average age of bridges according to the NDS can not be determined because their construction in the past did not go smoothly.The oldest part of the motorway in Slovakia is D2 Malacky – Bratislava from 1972 with twelve bridges, the highest is the Valy bridge at the part D3 Svrčinovec – Skalité with a height of 84 meters and the longest one is the D3 estacade in the section Žilina, Strážov – Žilina, Brodno with a length of almost 1.5 kilometers

  Triblavina, highway


Source link

Leave a Reply